A fresh look at Anava Samui on 5 November 2026. Our latest photographs bring the project into focus, from the low-rise buildings and curved balconies to the sea beyond the construction site. For buyers following Anava condo Samui, November offers a useful opportunity to see how the architecture is developing and review the milestones ahead.
Two dates lead this month’s update: the swimming pool is scheduled to start by the end of 2026, with an estimated three-month construction period, and the first-phase handover is planned for April 2027.
From the air: the development’s layout is clearly visible
The aerial photographs show the building arrangement, roof slabs and open spaces between the blocks. The rounded edges of the balconies give the buildings a distinctive profile, and the sea-facing photograph places the development in its coastal setting. It is a view of the site from drone height, rather than a representation of the outlook from every apartment.
For an introduction to the residences and their layouts, visit our Anava Samui condo listing. The construction photographs add a current, real-world perspective alongside the project information.

What has taken shape across the buildings?
The concrete structures shown in these images have reached roof level, and substantial masonry work is visible. Block walls now enclose many parts of the buildings, while window and doorway openings show where further installation and finishing work will follow.
The photographs also capture different stages of exterior work. Some elevations retain exposed grey blockwork, while others display broad white finished surfaces and the curved horizontal lines that characterise the design. Scaffolding remains around the facades, with materials, machinery and workers visible within the site.

These images are particularly helpful for understanding the building scale and the relationship between neighbouring blocks. They show the exterior condition on the day of photography; internal fit-out and building-system completion cannot be assessed from these views alone.

Pool construction: the next milestone before handover
The swimming pool works are planned to begin by the end of this year, December 2026. Once construction starts, the expected duration is approximately three months. If work begins in December, that would suggest a finish around March 2027, depending on the precise start date and construction progress.
This will be an important change to watch in the coming updates, as the spaces between the residential buildings develop further. The current photographs still show active work areas and stored materials. We will be following the transition from those construction spaces towards the planned shared facilities.
April 2027 is the planned first-phase handover
The current target for handing over the first phase of Anava Samui is April 2027. For anyone preparing for a purchase, the most useful next step is to check the schedule for the particular residence being considered. Building allocation, inspection dates and transfer arrangements should be confirmed for that unit.
The pool and handover dates are planned milestones rather than guaranteed completion dates. This November update uses the latest schedule provided to us alongside the photographs taken on 5 November 2026.
Considering a remaining unit at Anava Samui?
Whether you are looking for a home on the island or a property for future holiday use, choosing the right apartment begins with your priorities. Let us know the space you need, your preferred outlook and your budget. We can help you compare the remaining units available to buy and request the latest pricing, floor plans and payment schedule.
You can also explore our Bophut property listings for a wider look at the area, or browse the Anava project guide on Koh Samui Condos for additional project information.
See the progress for yourself. Contact My Thai House to enquire about remaining Anava condos and arrange a site visit. We will help you narrow down suitable options and confirm the current details before you make a decision.